Development MOST Data Aquisition Tool for Supply Module and Implimetation At Axle Supply Module in Mahindra
2010. 92 S.
Verlag/Jahr: VDM VERLAG DR. MÜLLER 2010
ISBN: 3-639-24250-5 (3639242505)
Neue ISBN: 978-3-639-24250-8 (9783639242508)
Objective of project is to scientifically estimate the work content of supply module operations for existing work methods and develop a software for obtaining the work standards of operations in the supply module based on MOST application technique. A computer based user- friendly software package is developed in Visual Basic .NET with single server for obtaining the standard time of the operations specified by the daily work monitoring system and determine the percentage working time of the workman in the work cycle and calculate the Effective Working Time (EWT) of the workmen for the day. The project was completed with all the required co-operation from the lobour union. The MOST technique and the proposed daily work monitoring system were introduced to the workmen of the supply module. New daily work monitoring system is implemented in Axle supply module in a view to help supply module management and Industrial Engineering department of the company. For improved productivity monitoring system, manpower budgeting and reduction in lead time of supply module.Mr Yusuf S Usmani is Lecturer in Department of Industrial Engineering at King Saud University. His areas of interest include production and operations management, He is an alumnus of VJTI Bombay.